Construction and Demolition Estimator

A kitchen in Middleburg, a tenant build-out along US-1 in St. Augustine, and a new house off the Northside do not produce the same waste per square foot. This estimator uses EPA job-site rates by project type and the floor area you enter, then recommends an Arwood Disposal roll-off and shows the estimated tons so you can mention them on the order page.

Add a pile that is already on the ground. Concrete from a foundation, garage or driveway is reported separately so it can go in a heavy-debris container.

Construction and Demolition Estimator

Select the project type and the floor area. The estimate uses U.S. EPA job-site waste rates in pounds per square foot. Add any pile already sitting on the ground.

Your project
Already torn out? (optional)
What goes into this estimate

Weight equals floor area multiplied by the EPA job-site rate for that project (64 lb per sq ft for a kitchen remodel, 4.39 for new-home scraps, 50 for house demolition without concrete, as examples). Volume equals weight divided by 417 lb per cubic yard (EPA mixed C&D). Demolition foundations and driveways are tallied separately as concrete (EPA: 48.4 lb per sq ft with a slab, 108.7 with a basement, garage and driveway). A 10 percent packing margin is applied so irregular pieces still fit.

Walking through a construction estimate

Select the closest project type and enter the square footage of the work itself. Optional length, width and height fields cover debris already torn out. Demolition options that include a slab or a basement will also produce a heavy-material recommendation.

The EPA rates in the background

Pounds per square foot come from the EPA's 2003 building-related C&D study: 64 for a kitchen remodel, 72.1 for a bathroom, 19.13 for a room addition, 19.55 for a whole-house remodel, 11.79 for office or commercial renovation, and 4.39 for new-home construction scraps. Structural demolition uses 50 pounds per square foot, plus 48.4 pounds of concrete per square foot for a slab job or 108.7 when a basement, garage and driveway come out. Loose mixed C&D volume uses 417 pounds per cubic yard.

Notes for superintendents and remodelers

  • The dumpster rentals page already describes 10- through 40-yard open-top boxes for construction firms and homeowners. This tool only sizes those roll-offs, not the 2- to 8-yard front-load commercial containers.
  • Keep slab, dirt and rock out of the mixed construction box. We can set a separate heavy-debris container and, when the stream is clean, talk about recycling.
  • If you would rather not staff the loading, say so. Loading labor is already offered on the dumpster page.
  • Call out roofing tear-off, tile or masonry when you order. Those materials change the weight picture.
  • Nationwide jobs use the same phone number. Tell us the street address and we will let you know what we can schedule there.

Frequently asked questions

How large a container does a kitchen renovation usually take?

A 150 square-foot kitchen at the EPA rate is about 9,600 pounds and 23 loose cubic yards, which this estimator sends to a 30-yard and flags for weight. Tighter kitchens often fit a 20-yard. Confirm the allowance, because this is above the 4,000-pound example published for a 20-yard ticket.

What size should I plan for a bathroom?

A 40 square-foot bathroom is about 2,884 pounds and a 10-yard in this math. Add any tile or tub already stacked in the driveway if you did not include that area.

How do I plan dumpsters for a full house demolition?

Run the demolition option that matches the foundation. You will get a mixed-debris size and, when a slab or basement is included, a separate heavy-debris plan capped at a 20-yard per pull. Large footprints need more than one container on both sides.

Is leftover concrete allowed in the construction box?

Not as a surprise at pickup. Schedule a dedicated heavy-debris dumpster and keep it clean. Clean heavy debris is already listed among our recycling streams.

Why might the estimate look high for a light cabinet swap?

The EPA remodel rates assume a full gut of the room, including hidden drywall and flooring waste. If the scope is truly a swap with almost no demolition, tell us when you order and we can discuss a smaller box.

Does this include a weight check?

It does. After a size is chosen by volume, the estimated tons are compared with the 4,000-pound included allowance in the published 20-yard example, and the result warns you when the estimate is over that mark.

Sources

Arwood Disposal roll-off sizes (10 to 40 yards), the 4,000-pound included allowance in a published 20-yard example, the named recycling streams, the offer of loading labor, and the Jacksonville headquarters at 16144 Main St N come from the live Arwood Disposal website. Heavy loads of concrete, dirt, sod and asphalt are sized at a 20-yard maximum and 15 tons per pull. Room and furniture volumes on the cleanout estimator are planning estimates.