Heavy Debris Estimator

A driveway in Macclenny or a patio tear-out in Palm Coast will max out a truck by pounds, not by empty space in a 40-yard box. Arwood Disposal quotes clean heavy debris as its own stream, and the dumpster rentals page already lists that stream among the materials we can recycle when it stays clean. This estimator sizes that kind of load and will not recommend a container larger than a 20-yard.

A published 20-yard example on this site offers a separate clean-concrete and aggregates path, with the requirement that no trash, dirt mixed as contamination, wood or other foreign material ride along. Confirm the path and the weight cap on your quote. This page does not list rates.

Heavy Debris Estimator

Concrete, dirt, sod and asphalt will hit a weight limit long before they fill a 40-yard. This estimator caps a heavy-debris box at a 20-yard and splits larger jobs into more than one pull.

Material
Size in place (before it is broken up)
Already broken up into a pile? (optional)
What goes into this estimate

Weight equals volume in place multiplied by FHWA in-place density (concrete 3,960 lb per cubic yard, asphalt 3,240, damp earth 3,370, topsoil and sod 2,430, brick 4,050, gravel 3,280). Container space equals weight divided by FHWA loose density, because broken material occupies 40-70% more room. A 10 percent packing margin is applied so irregular pieces still fit.

Describing the material

Choose concrete, asphalt, dirt, topsoil, sod, brick or gravel. Enter the length, width and thickness as it sits today, or type cubic yards in place. If the material is already broken into a pile, measure the pile instead of (or in addition to) the in-place dimensions. Leave thickness blank to use a typical value: 4 inches for concrete, 3 for asphalt, 2 for sod, 6 for dirt.

Why broken concrete needs more room

The FHWA earthwork table gives an in-place density and a loose density for each of these materials. This tool computes weight from the in-place figure, then uses the loose figure to estimate the space the broken pieces occupy. That is the 40 to 70 percent "fluff" you see when a slab becomes a pile of chunks.

How loads are planned in this tool

Heavy jobs stop at a 20-yard. When one container cannot take the volume or the weight, the estimator tells you how many pulls to expect. Each heavy load can carry up to 15 tons. Keep the material clean (no trash, wood or metal mixed in).

Ways to keep a heavy load on track

  • Keep the stream clean if you want the clean-aggregate path. Mixed trash can change the handling and the fee.
  • Dirt and concrete often can share a heavy-debris container; ask us if the mix is unusual.
  • Watch the pad. A loaded concrete box is hard on pavers and soft ground. We will talk through placement when you book.
  • If you need labor to break or load, say so. That help is already offered on the dumpster rentals page.
  • Sod is easy to underestimate. A 50-by-40 lawn at 2 inches is about 15 tons here and plans as two pulls.

Frequently asked questions

What size should I order for a concrete driveway or patio?

A 20-by-10-foot, 4-inch patio is about 4.9 tons and one 10-yard in this estimator. A 40-by-30-foot, 4-inch driveway is about 29.3 tons and two 15-yard pulls, because the weight sets the count, not the leftover space in a larger box.

How heavy is a cubic yard of concrete?

The FHWA in-place figure used here is 3,960 pounds. Loose, broken concrete is 2,370 pounds per cubic yard. Asphalt, damp earth, topsoil, brick and gravel have their own rows in the same table, listed in the sources.

Why is a 30- or 40-yard not offered for dirt or concrete?

Those larger boxes are for volume. They do not increase what a truck can legally and practically pull. This tool keeps heavy debris at a 20-yard or smaller and splits a job when a single pull would go over 15 tons.

How much does torn-out sod weigh?

This estimator treats sod as topsoil plus roots at 2,430 pounds per cubic yard in place. A thousand square feet at 2 inches is already a serious load. Run the lawn dimensions rather than judging by how the grass looks.

Can dirt and concrete share one dumpster?

Usually, in a dedicated heavy-debris box that stays free of household trash and wood. Confirm when you order. Do not add either material to a mixed construction load unless the quote says you may.

Does asphalt weigh less than concrete?

It does. FHWA lists asphalt paving at 3,240 pounds per cubic yard in place, compared with 3,960 for concrete. It is still planned as heavy debris, with the same 20-yard maximum in this tool.

Sources

Arwood Disposal roll-off sizes (10 to 40 yards), the 4,000-pound included allowance in a published 20-yard example, the named recycling streams, the offer of loading labor, and the Jacksonville headquarters at 16144 Main St N come from the live Arwood Disposal website. Heavy loads of concrete, dirt, sod and asphalt are sized at a 20-yard maximum and 15 tons per pull. Room and furniture volumes on the cleanout estimator are planning estimates.

See all dumpster calculators