Dumpster Size Estimator

From a Northside lot off Main Street to a remodel in St. Augustine, a subdivision drop in Palm Coast, or a job in Kingsland, the useful question is not "what is the biggest box" but "what will this debris actually fill and weigh." This estimator gives you a volume in cubic yards, a weight in tons, and a roll-off size Arwood Disposal can quote, using the 10-, 15-, 20-, 30- and 40-yard open-top containers already listed on our dumpster rentals page.

We work from 16144 Main St N, Jacksonville, FL 32218. Day-to-day dispatch is concentrated in Jacksonville, St. Augustine, Palm Coast, Macclenny, Middleburg and Kingsland, with the rest of Northeast Florida and Southeast Georgia, and we also take nationwide requests on the same phone line. The densities in this tool come from published EPA, FHWA and manufacturer data, not from a guess on the driveway.

Construction and Demolition Estimator

Select the project type and the floor area. The estimate uses U.S. EPA job-site waste rates in pounds per square foot. Add any pile already sitting on the ground.

Your project
Already torn out? (optional)
What goes into this estimate

Weight equals floor area multiplied by the EPA job-site rate for that project (64 lb per sq ft for a kitchen remodel, 4.39 for new-home scraps, 50 for house demolition without concrete, as examples). Volume equals weight divided by 417 lb per cubic yard (EPA mixed C&D). Demolition foundations and driveways are tallied separately as concrete (EPA: 48.4 lb per sq ft with a slab, 108.7 with a basement, garage and driveway). A 10 percent packing margin is applied so irregular pieces still fit.

Pick a material calculator

Roll-off sizes on the Arwood Disposal fleet

The live dumpster page lists open-top roll-offs from 10 cubic yards up to a 40-cubic-yard construction container. Front-load commercial dumpsters from 2 to 8 yards are a different product and are not what this tool sizes. A published 20-yard example on this site includes 4,000 pounds on a construction or general-waste ticket. This estimator uses that 4,000-pound included allowance as a planning threshold and warns you when an estimate is over it, especially on a 30- or 40-yard or a heavy roofing load.

The same dumpster page notes that boxes are loaded from the open top, that pickup hooks and greased guide rollers are part of the equipment, and that recycling can be arranged for clean heavy debris, tree or yard debris, scrap metal, cardboard, paper, tires and plastic. If you do not want to load the box yourself, we can provide the labor.

Example outputs from this math:

Size An estimate this tool produces Approximate weight
10-yard 40 sq ft bathroom remodel (about 6.9 cubic yards) About 1.4 tons
10-yard 20 x 10 ft concrete patio, 4 inches thick About 4.9 tons (heavy debris)
15-yard 100 medium moving boxes, still set up Well under a ton
20-yard 15 x 8 x 4 ft brush pile About 1.1 tons
20-yard 30-square roof, two laminated layers About 6.2 tons (over the 4,000-pound included allowance)
30-yard Average 7-room house plus a garage About 3.5 tons
2 x 40-yard Packed 7-room house plus two garages About 3.6 tons per container

This page does not list rental rates. Call (855) 713-6280, email [email protected], or use the roll-off order page for a price at your address.

What the estimate is based on

  1. Counts and measurements are converted to pounds with a published factor for the material.
  2. Pounds are converted to the loose cubic yards the debris occupies in an open-top box.
  3. A 10 percent packing margin is applied, and the smallest of the five roll-off sizes that covers that volume is chosen.
  4. Weight is checked against the 4,000-pound planning threshold taken from the published 20-yard example.
  5. Concrete, dirt, sod and asphalt are held to a 20-yard maximum. If one pull would go over 15 tons, the job is split into more loads.

Frequently asked questions

Will this estimator match the scale ticket?

It is a planning number, usually tight enough to pick a size. Water in the load, tighter packing, or surprise material will move the result. When you are close to a limit, size up or ask us to set the allowance in the quote.

Is a larger container always the safer choice?

For bulky, light debris, often yes: one haul usually costs less than two. For concrete, dirt, sod or asphalt, a bigger box does not increase what the truck can carry. This tool keeps those loads at a 20-yard or smaller.

How are cubic yards different from tons?

Yards are space. Tons are weight. A 20-yard of cardboard can be a fraction of a ton; a 20-yard of broken concrete is a heavy-material job and may need more than one pull.

Can I put leftover slab or fill dirt in a mixed construction dumpster?

Keep it out of a mixed load unless the quote says otherwise. Order a dedicated heavy-debris container and leave trash out of it. Clean heavy debris is one of the recycling streams already named on the dumpster rentals page.

Who published the weight factors?

The U.S. EPA (volume-to-weight factors and a construction-waste study), the Federal Highway Administration's earthwork table, Owens Corning's shingle declaration, university extension firewood data and U-Haul box sizes. Each material page lists the ones it uses.

How do I turn this estimate into a delivery?

Open the Order a roll-off button, go to the roll-off order page, call (855) 713-6280, or write [email protected]. Include the street address, the dates, the debris and your estimated tons.

Sources

Arwood Disposal roll-off sizes (10 to 40 yards), the 4,000-pound included allowance in a published 20-yard example, the named recycling streams, the offer of loading labor, and the Jacksonville headquarters at 16144 Main St N come from the live Arwood Disposal website. Heavy loads of concrete, dirt, sod and asphalt are sized at a 20-yard maximum and 15 tons per pull. Room and furniture volumes on the cleanout estimator are planning estimates.