Shingle Tear-Off Estimator

A Northside bungalow and a larger Palm Coast roof can look similar from the street and produce very different tickets once a second layer comes off. This estimator turns roofing squares and layers into an Arwood Disposal roll-off size and a tonnage figure you can put on the order. If you only know the house footprint and pitch, the tool will convert those to squares first.

Shingle Tear-Off Estimator

Enter the roof in squares (100 sq ft of roof surface) and the number of layers coming off. If you do not have squares, use the house footprint and pitch.

Roof size
Tear-off
What goes into this estimate

Weight equals squares multiplied by layers multiplied by shingle weight per square (Owens Corning EPD: 190 lb for 3-tab, 207 lb for laminated). Volume equals weight divided by 731 lb per cubic yard (EPA asphalt roofing). A footprint is converted with the pitch factor (square root of 1 + (rise/12) squared). A 10 percent packing margin is applied so irregular pieces still fit.

What to enter

A square is 100 square feet of roof surface, the unit already printed on most roofing bids. Enter every layer that is coming off. Choose laminated/architectural or 3-tab. Use the footprint fields only when the square count is unknown.

Where the pounds come from

Shingle mass is taken from Owens Corning's asphalt shingle EPD, Table 4: roughly 190 pounds per square for 3-tab and 207 pounds per square for laminated product. Underlayment, nails and decking are not in those figures, so a rotten-deck tear-off will run heavier. Volume uses the EPA asphalt-roofing factor of 731 pounds per cubic yard. Footprint is converted with the pitch factor, the square root of 1 plus (rise/12) squared.

Numbers you can hold next to the bid

One layer on a 25-square laminated roof is about 5,175 pounds and a 10-yard by volume, already above the 4,000-pound included allowance in the published 20-yard example, so the result carries a weight warning. Two laminated layers on 30 squares is about 6.2 tons and a 20-yard. A tear-off this heavy still does not belong in a giant, lightly loaded box just to chase volume.

Field tips for tear-offs

  • Mention the estimated tons when you call (855) 713-6280 or use the order page. Shingles are a weight-first material.
  • Count layers honestly. A reroof laid over the original nearly doubles the load.
  • Place the box where the crew can throw short, and talk to us if the truck must cross pavers or a tight drive.
  • Ordinary tear-off decking, felt and flashing can usually ride with the shingles. Suspected asbestos-containing roofing is a different, regulated path and has to be resolved first.
  • Do not heap the load above the walls.

Frequently asked questions

What size dumpster does a normal house roof need?

Many single-layer, 20- to 30-square jobs fit a 10- or 15-yard by space and still need a weight review because of the published 4,000-pound example. Enter your squares and tell us the tons.

How much does one square of shingles weigh?

This estimator uses 190 pounds for 3-tab and 207 pounds for laminated, from the Owens Corning declaration. Other brands are in the same range. Water and attached decking add more.

How many squares can I put in a 10-yard?

By empty space, more than most tickets will allow by weight. With 207-pound squares and the packing margin, the allowance is the first limit, which is why the 25-square example already carries a warning.

If there are two layers, do I just double the weight?

Yes, for planning. The tool multiplies squares by layers. If the bottom layer is a different product, choose the heavier type or add a little margin.

What does "square" mean on a roof?

One hundred square feet of sloped roof surface, not the first-floor footprint. A 2,000 square-foot footprint at a 6/12 pitch is about 22.4 squares.

Can I throw torn-out decking in with the shingles?

Usually, on a tear-off we have quoted as roofing or construction debris. Tell us if a large share of the deck is coming off. Leave household trash and chemical containers out.

Sources

Arwood Disposal roll-off sizes (10 to 40 yards), the 4,000-pound included allowance in a published 20-yard example, the named recycling streams, the offer of loading labor, and the Jacksonville headquarters at 16144 Main St N come from the live Arwood Disposal website. Heavy loads of concrete, dirt, sod and asphalt are sized at a 20-yard maximum and 15 tons per pull. Room and furniture volumes on the cleanout estimator are planning estimates.

See all dumpster calculators